Intervention on the IP8/A26 to duplicate the existing alignment between the Relvas Verdes and Roncão interchanges, enhancing access to the Port of Sines and improving traffic flow and safety.
Scope:
- Duplication of approximately 14.1 km to a 2×2 lane profile;
- Upgrading of connections at existing interchanges (Relvas Verdes, Badoca, Ademas);
- Improvement of driving conditions and traffic fluidity.
