Select Page

Projects

Salamonde II Power-Upgrade Projects

Salamonde II Power-Upgrade Projects

M‑ODU – Slaughterhouse – Other Urban Destination

M‑ODU – Slaughterhouse – Other Urban Destination

Industrial Unit of ACWIN in Ribeirão

Industrial Unit of ACWIN in Ribeirão

Modernization of the railway link between Sines and the Southern Line

Modernization of the railway link between Sines and the Southern Line

Quadrupling of the Cintura Line and Modernisation of the Northern Line

Quadrupling of the Cintura Line and Modernisation of the Northern Line

New Zambezi River Bridge

New Zambezi River Bridge

Porto Office Park

Porto Office Park

IP8 / A26 – Connection between Sines and A2 – IP8 Section from Relvas Verdes to Roncão

IP8 / A26 – Connection between Sines and A2 – IP8 Section from Relvas Verdes to Roncão

Vila Franca de Xira Hospital

Vila Franca de Xira Hospital

Construction Project for Two Additional Lines in the Siphons of the Álamos – Loureiro Connection and the 1st Section of the Reguengos de Monsaraz Hydraulic Circuit (Water Intake on the Peral road)

Construction Project for Two Additional Lines in the Siphons of the Álamos – Loureiro Connection and the 1st Section of the Reguengos de Monsaraz Hydraulic Circuit (Water Intake on the Peral road)

Noise Analysis Study at Portela Airport

Noise Analysis Study at Portela Airport

Towngardens Lot 8, 3/7

Towngardens Lot 8, 3/7

No results found.