Select Page

Environment

Integrated Water Resources Management Plan for the Cubango River Basin – Angola

Integrated Water Resources Management Plan for the Cubango River Basin – Angola

Environmental Due Diligence for the EGEO Group

Environmental Due Diligence for the EGEO Group

Primary Infrastructure for Flow Regulation of the Crato Multipurpose Hydraulic Project – Pisão Dam and Hydroelectric Power Plant

Primary Infrastructure for Flow Regulation of the Crato Multipurpose Hydraulic Project – Pisão Dam and Hydroelectric Power Plant

Desalination System in the Algarve region and the Photovoltaic Plant for Self-Consumption

Desalination System in the Algarve region and the Photovoltaic Plant for Self-Consumption

Construction Project for Two Additional Lines in the Siphons of the Álamos – Loureiro Connection and the 1st Section of the Reguengos de Monsaraz Hydraulic Circuit (Water Intake on the Peral road)

Construction Project for Two Additional Lines in the Siphons of the Álamos – Loureiro Connection and the 1st Section of the Reguengos de Monsaraz Hydraulic Circuit (Water Intake on the Peral road)

Rehabilitation and extension of water and electricity networks / reservoirs in Bissau

Rehabilitation and extension of water and electricity networks / reservoirs in Bissau

Noise Analysis Study at Portela Airport

Noise Analysis Study at Portela Airport

Verdelago Resort

Verdelago Resort

No results found.