Select Page

Engineering Consultancy for the Zinc Expansion Project (ZEP) – Neves‑Corvo Mine

,

Services

Licensing, technical design and works supervision

Company

GIBB Engineering

Client

AMEC Foster Wheeler / Wood Group (AMEC FW)

Location

Castro Verde

Year

2018-2023

Expansion of the zinc processing plant at the Neves‑Corvo Mine, increasing production capacity from 1.1 to 2.5 Mtpa. The services ensured compliance with Portuguese legislation for licensing purposes, including technical translation of design documentation. Additional services included construction supervision and design adaptation during works, covering civil, electrical and mechanical engineering disciplines.