Expansion of the zinc processing plant at the Neves‑Corvo Mine, increasing production capacity from 1.1 to 2.5 Mtpa. The services ensured compliance with Portuguese legislation for licensing purposes, including technical translation of design documentation. Additional services included construction supervision and design adaptation during works, covering civil, electrical and mechanical engineering disciplines.
Engineering Consultancy for the Zinc Expansion Project (ZEP) – Neves‑Corvo Mine
,
Services
Licensing, technical design and works supervision
Company
GIBB Engineering
Client
AMEC Foster Wheeler / Wood Group (AMEC FW)
Location
Castro Verde
Year
2018-2023